In the last week of August 2023, days before the autumn term, schools across England were told to close buildings they had used safely for decades. The reason was a material most headteachers had never heard of: reinforced autoclaved aerated concrete, or RAAC.

The headlines have faded. The material has not gone anywhere. It is still in roofs, and sometimes floors and walls, of buildings put up over several decades of the last century, and most of those buildings are not schools. They are offices, council buildings, courts, surgeries, theatres, warehouses and retail units, many of them leased to tenants who have never asked the question.

What makes RAAC different from most building defects is the way it fails. The Department for Education's guidance records a roof collapse in an operational school that was sudden and came with no apparent warning. A hazard that gives no warning cannot be managed by waiting for signs.

If you own, manage, lease or run a building from that era, here are the eleven things worth knowing, in the order you would need them.

What it is and why it matters

1. RAAC is a lightweight, aerated form of concrete

The Department for Education's identification guidance describes RAAC as a lightweight, bubbly form of concrete, found predominantly as precast panels in roofs, mostly flat and sometimes pitched, and occasionally in floors and walls. It contains no coarse aggregate, the stones you would see in ordinary concrete, which is what makes it light and also what makes it weak.

2. The date range depends on who you ask

This matters for screening. The Health and Safety Executive says RAAC was commonly used in UK buildings between the mid 1960s and the mid 1980s. The Department for Education says it was commonly used between the 1950s and the mid 1990s, and its own questionnaire went to every school with blocks built between 1930 and 1990. The sensible approach is to screen on the wider range. A building erected or substantially altered at any point from the 1950s to the mid 1990s should not be ruled out on its age alone.

3. It is weaker than ordinary concrete and past its expected life

The DfE guidance states that RAAC panels are considerably weaker than traditional concrete and are now beyond their estimated service life, with concerns about their structural integrity. The HSE's guidance on managing the risk is blunter: it is less durable than traditional concrete, and it is liable to collapse.

4. It is not only a schools problem

Schools drew the attention because the government surveyed them. By 8 February 2024 the number of education settings in England where RAAC had been identified stood at 234. No equivalent survey exists for commercial property. The HSE guidance is addressed to anyone with a legal duty to manage buildings, and its further reading covers government and local authority buildings generally. An office block of the right age that has never been checked is in the same position a school was in before 2023.

Who is responsible, and under what law

5. The dutyholder is whoever controls the building's fabric

The HSE describes the dutyholder as the building owner, the landlord for the premises, or the person or organisation with clear responsibility for the building's maintenance or repair. In a leased building that turns on the lease. A tenant on a full repairing lease may hold the duty for the structure. A tenant of one floor in a multi let building usually does not, but still has every reason to ask the landlord what is in the roof above its staff.

The underlying statute is section 4 of the Health and Safety at Work etc. Act 1974, which places a duty on each person who has, to any extent, control of non-domestic premises to take such measures as it is reasonable for a person in their position to take to ensure, so far as is reasonably practicable, that the premises are safe.

6. There is no RAAC regulation, but there is a stability one

No law names RAAC. The duties come from general provisions, and one of them is more specific than most people realise. Regulation 4A of the Workplace (Health, Safety and Welfare) Regulations 1992 states that where a workplace is in a building, the building shall have a stability and solidity appropriate to the nature of the use of the workplace. Regulation 5 adds that the workplace must be maintained in an efficient state, in efficient working order and in good repair.

For an employer, the risk assessment required by the Management of Health and Safety at Work Regulations 1999 completes the picture. If your building is of an age where RAAC is possible, the possibility is a foreseeable risk, and an assessment that never asks the question is hard to defend. The wider duties in those Regulations are covered in our guide to the Workplace Regulations 1992.

Finding out whether you have it

7. A trained eye can often spot it

The DfE guidance gives a checklist for anyone looking directly at an unfinished structure. The distinctive features are:

  • concrete panels that are typically 600mm wide;
  • V shaped grooves at regular spacing, normally 600mm, in a floor, wall or ceiling;
  • surfaces that are white or light grey where unpainted, and smooth on the underside;
  • a bubbly interior, often compared to an aerated chocolate bar, with no visible stones;
  • drawings that refer to RAAC or name the suppliers Siporex, Durox, Celcon, Hebel or Ytong;
  • panels that bow or deflect, sometimes leaving a visible gap between neighbours.

Original drawings and records of later alterations are worth finding before anyone climbs a ladder.

8. Do not go looking without the asbestos register

This is the point most likely to turn one problem into two. Buildings of the RAAC era are also buildings of the asbestos era. The DfE guidance warns that if you need to look behind ceilings or finishes you should consult the building's asbestos register first, and that you should not try to make an indentation in a panel with a surface covering, because the covering may contain asbestos. The HSE adds that a collapse, or the work to remediate RAAC, could itself disturb asbestos, and that information on its location and condition must be shared with anyone liable to disturb it. Our guides to asbestos in office buildings and what every dutyholder must know about asbestos explain that duty.

9. Only a qualified professional can confirm it

A facilities manager can suspect RAAC. Confirming it is a job for an appropriately qualified building surveyor or structural engineer, which is what the DfE guidance requires of schools. Where RAAC is confirmed or suspected, the HSE says to seek guidance from a competent structural engineer to assess it and develop a management plan, and points to the Institution of Structural Engineers' guidance as the authoritative source. A general condition survey that does not mention RAAC is not evidence that there is none. Ask whether it was looked for.

What happens if it is there

10. In schools, the instruction is to vacate

For state funded education settings in England the position is strict. The Department's guidance for settings with confirmed RAAC advises responsible bodies to vacate and restrict access to spaces with confirmed RAAC, and to keep them out of use until appropriate mitigations are in place, even where they would previously have been deemed non-critical. The Department has committed to funding removal from schools and colleges through grants or its rebuilding programme. The broader estate duties that sit alongside this are in our guides to school estates and health and safety in schools.

11. Elsewhere, the answer is an engineer's management plan

For other buildings there is no blanket instruction. The HSE's sequence is identify, assess, manage. The engineer's assessment decides what follows, which may range from monitoring and restricting loads on a roof, through propping or strengthening, to closing an area or replacing the panels. What the dutyholder must have is the plan in writing, the actions it requires completed, and the inspections it specifies kept up. Water is the enemy of this material, so roof leaks and blocked drainage above RAAC panels move from maintenance items to safety items.

The eleven at a glance

StagePointsWhat to do
Understand1 to 4Screen every building from the 1950s to the mid 1990s, not only schools
Responsibility5 and 6Establish who controls the structure; note regulation 4A
Find out7 to 9Check drawings, look with the asbestos register in hand, appoint a surveyor or engineer
Act10 and 11Schools vacate; others follow the engineer's management plan

What tenants and employers should ask this month

Most readers of this article are not building owners. They are employers in leased space, and their practical step is a letter. Ask the landlord or managing agent three questions. Has the building been assessed for RAAC, and by whom? If it is present, where is it and what does the management plan require? And who will tell us if that changes? Keep the reply with your risk assessment. What else a tenant should expect to receive is set out in our guide to landlord health and safety documentation.

For organisations with many buildings, the task is a register: each building, its age, whether RAAC has been ruled out, suspected or confirmed, who said so and when. That is the kind of record health and safety consultants and software hold well together, and our health and safety audits ask for it alongside the asbestos register and the fire risk assessment for education and office estates.

The international picture

RAAC became a British news story, but the material was not a British invention, and the supplier names in the DfE checklist are international brands. Aerated concrete products have been used in many countries, in different forms and to different standards, over the same decades.

That does not mean every older building abroad has the same problem. The UK concern is tied to particular reinforced panels of a particular era, and how they were made, installed and maintained. It does mean a group with older premises in several countries should not assume the question stops at the border. The devolved nations have published their own guidance, and elsewhere the right step is to ask a local structural engineer whether similar panels were used and how they are regarded there.

The management principle travels well even where the material does not: know what your buildings are made of, know who is responsible for the structure, and hold the evidence. Our international health and safety consultants apply that to estates that cross borders.

Where Arinite fits

Arinite is a firm of health and safety consultants, not structural engineers. We do not confirm or assess RAAC, and anyone who tells you they can do so without that qualification should be treated with caution. Our role is the management around it: helping you establish who the dutyholder is, making sure the question has been asked of every building, coordinating the RAAC position with the asbestos register and the risk assessment, and checking that an engineer's management plan is being followed.

We have worked this way for more than 15 years, with over 1,500 businesses, across more than 50 countries and over 100,000 employees, and we retain more than 95% of the clients who start with us. Our global health and safety consultants support schools, trusts, universities and office occupiers whose buildings are older than their records.

Do you know when your building was built, and has anyone ever told you in writing what its roof is made of?

Share this article
A

Written by

Arinite Health & Safety Consultants

Health & Safety Expert at Arinite

Free Resources

Health & Safety Factsheets

Download our comprehensive library of expert guides, checklists, and templates.

Get Professional Help

Need Expert H&S Advice?

Our qualified consultants are ready to support your specific business needs.